Skip to content
Skip to search
Skip to footer site map

FireSmart for Industry

FireSmart Industry Bulletins

Industrial Wildfire Control Plan

All companies submitting an Industrial Wildfire Control Plan are required to do so through the Alberta Wildfire System (AWS):

Supporting Documents

Powerline Hazard Assessment Plan (PHAP)

The Powerline Hazard Assessment Plan is applicable to all powerlines within the province of Alberta and is a requirement in the Environmental Field Report (EFR) for powerlines that fall within the Forest Protection Area (FPA). This also applies to Vegetation Control Easements (VCE), but not to underground lines.

The purpose of the PHAP is to reduce wildfires cause by powerline contacts and the threat of infrastructure damage from an encroaching wildfire.

Effective May 2010, the PHAP process changed. Please read the plan to ensure your EFR submission is completed correctly.

For instructions on how to access the PHAP application and complete the assessment, see the Powerline Hazard Assessment Plan at:

Resources

 

Page Navigation

Skip to breadcrumb trail

Page Information

Updated: Jan 24, 2012