FireSmart for Industry
FireSmart Industry Bulletins
Industrial Wildfire Control Plan
All companies submitting an Industrial Wildfire Control Plan are required to do
so through the Alberta Wildfire System (AWS):
Supporting Documents
Powerline Hazard Assessment Plan (PHAP)
The Powerline Hazard Assessment Plan is applicable to all powerlines within the
province of Alberta and is a requirement in the Environmental Field Report (EFR)
for powerlines that fall within the Forest Protection Area (FPA). This also applies
to Vegetation Control Easements (VCE), but not to underground lines.
The purpose of the PHAP is to reduce wildfires cause by powerline contacts and the
threat of infrastructure damage from an encroaching wildfire.
Effective May 2010, the PHAP process changed. Please read the plan to ensure your
EFR submission is completed correctly.
For instructions on how to access the PHAP application and complete the assessment, see the Powerline Hazard Assessment Plan at:
Resources
Page Navigation
Skip to breadcrumb trail
Page Information
Updated: Jan 24, 2012